-
Narrandera Floodplain Risk Management Study - Survey
Includes RTA floor level -
Narrandera Floodplain Risk Management Study - Mapping
Includes flood estimates -
Narrandera Floodplain Risk Management Study - Topography
Contour (2m) Major roads Railway Rivers Roads -
Narrandera Floodplain Risk Management Plan - Planning
Includes cadastre and LEP 1991 region -
Barellan Flood Study - Hydraulic Model Outputs (TUFLOW)
Hydraulic Model Outputs (TUFLOW) -
Narrandera Flood Study Review and Levee Options Assessment - Hydrological...
Hydrological Model Inputs (DRAINS) -
Narrandera Floodplain Risk Management Plan - Mapping
Includes flood estimates -
Barellan Flood Study - Hydraulic Model Inputs (TUFLOW)
Hydraulic Model Inputs (TUFLOW) -
Narrandera Flood Study Review and Levee Options Assessment - Spacial Floor Layers
Assessed Flood Protection Measures Catchments Flood Extents Flood Planning Impacts on Flood Protections Schemes Provisional Flood Hazard and Hydraulic Categorisation Sensitivity... -
Narrandera Floodplain Risk Management Plan - Survey
Includes RTA floor level -
Barellan Levee Construction Plans
Construction Plans for the Barellan Levee based in Option D in the Barellan Levee Options Feasibility Study (WMS February 2021)