-
Narrabeen Lagoon Flood Study Report
The Narrabeen Lagoon Flood Study has been prepared for Warringah and Pittwater Councils (The Councils) to define the existing flood behaviour in the Narrabeen Lagoon catchment... -
Ingleside, Elanora and Warriewood OFFS (2019)
Ingleside, Elanora and Warriewood OFFS - Main Report and Appendices -
Dee Why South Catchment Flood Study
This report has been prepared for Warringah Council to define the nature and extent of flood in the Dee Why South Catchment. Flood modelling was completed to define flood... -
South Creek Floodplain Risk Management Plan report
Study Context The preparation of this plan follows on from the Flood Study (WMA, 2006) and Floodplain Risk Management Study (Cardno Lawson Treloar, 2007a) and forms the fifth... -
Manly Lagoon Flood Study
Conclusions Provided below is a summary of the key findings of the Flood Study, in particular some of the important considerations for future floodplain risk management in the... -
Great Mackerel Beach Floodplain Risk Management Study & Plan
Study area As previously mentioned, Great Mackerel Beach (Figure 1) is a small coastal community on the western shore of Pittwater. The entrance system at Great Mackerel Beach... -
McCarrs Creek, Mona Vale and Bayview Flood Study Report
This report details the results and findings of the Flood Study investigations. The key elements include: • a description of the study area; • a summary of available historical... -
Ryan Place Overland Flood Study
The catchment area to Old Pittwater Road is 11.9 hectares (Figure 1). Downstream of Old Pittwater Road runoff flows through the Warringah Mall Shopping Centre and into Brookvale... -
Mona Vale / Bayview Floodplain Risk Management Study and Plan
This Floodplain Risk Management Study and Plan for Mona Vale/Bayview has been undertaken by Cardno Lawson Treloar for Pittwater Council to identify and examine options for the... -
Dee Why CBD Flood Study Update
Warringah Council has identified a need to prepare a drainage and flood mitigation plan for the Dee Why Town Centre. The plan is needed to accompany the Dee Why Town Centre... -
South Creek Flood Study
South Creek is a 7.3 km2 catchment which drains to the southern shore of Narrabeen Lagoon through Cromer Golf Course (Figures 1, 2 and 3). The catchment area is predominantly... -
Careel Creek Floodplain Risk Management Plan - Hydrological Model Inputs (XP-RAFTS)
Hydrological Model Inputs (XP-RAFTS) -
McCarrs Creek, Mona Vale and Bayview FS GIS Results
A range of design event durations were simulated to determine the critical duration for flooding throughout the study area. Generally, shorter duration events are critical in... -
Manly to Seaforth FS GIS Data
GIS data utilised aerial photos, building outlines, cadastre, GIS layers, study area, rainfall gauges, RTA Classified Roads, site inspection and the study area.