-
Barellan Levee Construction Plans
Construction Plans for the Barellan Levee based in Option D in the Barellan Levee Options Feasibility Study (WMS February 2021) -
Murrumbidgee Irrigation Canal Levee - Seepage and Stability Analysis
This report has been prepared by the Dams Section of Infrastructure Services - Public Works Advisory (PWA) and presents the findings of a desktop seepage and stability analysis... -
Narrandera Floodplain Risk Management Study - Property
Combined property database -
Narrandera Flood Study Review and Levee Options Assessment - Report
Volume 1 and Volume 2 -
Narrandera Floodplain Management - Consequence Management Plan
The initial aims of the engagement were to investigate the structural integrity of the canal embankment (acting as the town’s levee bank) with a view to determining the best... -
Narrandera Floodplain Risk Management Study - Planning
Includes cadastre and LEP 1991 region -
Narrandera Levee - Levee Structural Integrity Report
A structural assessment of the southern bank of the Murrumbidgee Irrigation Canal, acting as a levee providing protection to Narrandera has been undertaken. Due to the great age... -
Narrandera Flood Study Review and Levee Options Assessment - Hydraulic Model...
Hydraulic Model Outputs (TUFLOW)- Classic
- GPU
- Main Canal Classic
-
Review of the Narrandera Floodplain Risk Management Study and Plan -...
Drains Hydrological Model Input and Output Files. -
Narrandera Floodplain Risk Management Plan - Property
Combined property database -
Review of the Narrandera Floodplain Risk Management Study and Plan - Report
Report and Figures. Addendum from 18 July 2023 was added to this dataset 4/4/2024. The addendum provides an update on the implementation of measures set out in the main report... -
Narrandera Flood Study Review and Levee Options Assessment - Hydraulic Model...
Hydraulic Model Inputs (TUFLOW)- Classic
- GPU
- Main Canal Classic