Summary of results. Joint GSQ_GA Geochronology Project, Peralkaline Magmatic Systems and Northeast Queensland Deposits projects, 2023_2024
Created 17/10/2025
Updated 17/10/2025
Files and APIs
Tags
Additional Info
| Field | Value |
|---|---|
| Title | Summary of results. Joint GSQ_GA Geochronology Project, Peralkaline Magmatic Systems and Northeast Queensland Deposits projects, 2023_2024 |
| Language | eng |
| Licence | Not Specified |
| Landing Page | https://data.gov.au/data/en/dataset/31a24a52-6e86-4f2e-9990-673322ce2335 |
| Contact Point | |
| Reference Period | 31/10/2024 |
| Geospatial Coverage |
Map data © OpenStreetMap contributors
{
"coordinates": [
[
[
154.0,
-27.0
],
[
145.0,
-27.0
],
[
145.0,
-16.0
],
[
154.0,
-16.0
],
[
154.0,
-27.0
]
]
],
"type": "Polygon"
}
|
| Data Portal | Geoscience Australia |
Data Source
This dataset was originally found on
Geoscience Australia
"Summary of results. Joint GSQ_GA Geochronology Project, Peralkaline Magmatic Systems and Northeast Queensland Deposits projects, 2023_2024". Please visit the source to access the original metadata of the
dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/summary-of-results-joint-gsq_ga-geochronology-project-peralkaline-magmatic-systems-and-nor-2024