Proposed drilling at King Island scheelite mine, King Island

Created 16/10/2025

Updated 19/11/2025

On the 5th February, Mr. A. A. McLeod, General Superintendent of King Island Scheelite, N.L., telegraphed that it was desired to obtain further information about the ore structure to the north-east of cross-section line 13, and suggested the drilling of two diamond drill holes. Three possible sites and holes were discussed. In response to a request from Mr. McLeod, a visit was paid to the mine on the 26th and 27th ultimo, when returning from Mount Bischoff mine, Tasmania. The whole position regarding the above portion of the deposit and open cut were reconsidered, and problems regarding drilling further west on the northern side were also investigated. A short statement was prepared while at the mine which forms the basis of the remainder of this report.

Files and APIs

Tags

Additional Info

Field Value
Title Proposed drilling at King Island scheelite mine, King Island
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/en/dataset/724a4c97-f37f-494c-b738-e7b0e56ad945
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 17/11/2025
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    [
      [
        143.9,
        -40.2
      ],
      [
        144.2,
        -40.2
      ],
      [
        144.2,
        -39.9
      ],
      [
        143.9,
        -39.9
      ],
      [
        143.9,
        -40.2
      ]
    ]
  ],
  "type": "Polygon"
}
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Proposed drilling at King Island scheelite mine, King Island". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/proposed-drilling-at-king-island-scheelite-mine-king-island