Electricity transmission line from Bayswater Power Station to Mount Piper Power Station :

Created 24/06/2025

Updated 16/08/2025

This statement examines the environmental impacts associated with the proposed construction of a 500 kV transmission line required to carry the bulk of the power generated at Bayswater Power Station to Mount Piper Power Station.

Files and APIs

Additional Info

Field Value
Title Electricity transmission line from Bayswater Power Station to Mount Piper Power Station :
Language English
Licence Creative Commons Attribution 3.0 Australia
Landing Page https://data.gov.au/data/en/dataset/874b8027-8649-4ee4-8481-045308a09ba1
Remote Last Updated 27/02/2024
Contact Point
NSW Department of Planning, Housing and Infrastructure
?datansw@customerservice.nsw.gov.au
Reference Period 24/06/2008
Geospatial Coverage New South Wales
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Electricity transmission line from Bayswater Power Station to Mount Piper Power Station :". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-electricity-transmission-line-from-bayswater-power-station-to-mount-piper-power-station7ecd