Murray Basin Hydrogeological Project : progress report 5 for half year ending 31 March 1981

Created 16/10/2025

Updated 16/10/2025

The groundwater modelling sub-committee set up by the Steering Committee in June 1980, met in October and recommended that a preliminary model of the Basin should be attempted; it should contain 3 layers, with a 10 x 10 grid (300 nodes) and have the aim of increasing theaccuracy of solutions at later stages by decreasing the grid size. The sub-committee proposed that a whole basin model be attempted by the South Australian Department of Mines & Energy using a finite element method, and by the Water Resources Commission of New South Wales using a finite difference approach; the methods could then be compared before a more elaborate model was tried.

Files and APIs

Tags

Additional Info

Field Value
Title Murray Basin Hydrogeological Project : progress report 5 for half year ending 31 March 1981
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/en/dataset/7f1472e7-5100-4603-8f95-508dcae4aa86
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage Australia
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Murray Basin Hydrogeological Project : progress report 5 for half year ending 31 March 1981". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/murray-basin-hydrogeological-project-progress-report-5-for-half-year-ending-31-march-1981