Work continued on the compilation of the geological map of the Basin and associated figures. The Steering Committee met in December during the International Conference "Groundwater and Man" at the University of New South Wales, and one outcome of the meeting was the provision of a statement on the current status of the Project to the Victorian Parliamentary Salinity Committee, the Interim Council of the Institute of Freshwater Studies, and the River Murray Commission. During the period Dr R.S. Evans was nominated to represent the Victorian State Rivers and Water Supply Commission on the Steering Committee.

Files and APIs

Tags

Additional Info

Field Value
Title Murray Basin Hydrogeological Project : progress report 11 for half year ending 31 March 1984
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/en/dataset/64e5acf9-c7ea-442a-99ea-0c2380d149ac
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage Australia
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Murray Basin Hydrogeological Project : progress report 11 for half year ending 31 March 1984". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/murray-basin-hydrogeological-project-progress-report-11-for-half-year-ending-31-march-1984