Dam sites on the Laloki River, Papua

Created 16/10/2025

Updated 16/10/2025

For the projected development of the hydroelectric power resources of the Laloki River, Papua, a diversion weir will be required. Two sites have been selected by the officers of the Department of Works and Housing, downstream from Rouna Falls and another site, upstream from the falls, which would be suitable for a large scale power development. An inspection of these sites was made in order to indicate any geological difficulties which may be expected. The situation, physiography, and geology of the proposed sites, as well as the suitability of these sites, are discussed in this report.

Files and APIs

Tags

Additional Info

Field Value
Title Dam sites on the Laloki River, Papua
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/en/dataset/f0188dc1-204e-480b-80d0-d9d3dd7ea8f5
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    [
      [
        147.0,
        -9.6
      ],
      [
        147.5,
        -9.6
      ],
      [
        147.5,
        -9.2
      ],
      [
        147.0,
        -9.2
      ],
      [
        147.0,
        -9.6
      ]
    ]
  ],
  "type": "Polygon"
}
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Dam sites on the Laloki River, Papua". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/dam-sites-on-the-laloki-river-papua