Cost of Salinity to Local Infrastructure 1996-97 – Total cost all infrastructure (buildings, road, rail and bridges) based on the high estimate as described in the project reports. Costs are estimates of the impact of the current (2000) extent of salinity
Created 12/05/2013
Updated 11/08/2023
Files and APIs
Tags
Additional Info
Field | Value |
---|---|
Title | Cost of Salinity to Local Infrastructure 1996-97 – Total cost all infrastructure (buildings, road, rail and bridges) based on the high estimate as described in the project reports. Costs are estimates of the impact of the current (2000) extent of salinity |
Language | English |
Licence | Not Specified |
Landing Page | https://data.gov.au/data/en/dataset/44180c1d-e186-4035-8a6d-44faf83fd81d |
Contact Point | |
Reference Period | 12/05/2013 |
Geospatial Coverage | Australia |
Data Portal | data.gov.au |
Data Source
This dataset was originally found on
data.gov.au
"Cost of Salinity to Local Infrastructure 1996-97 – Total cost all infrastructure (buildings, road, rail and bridges) based on the high estimate as described in the project reports. Costs are estimates of the impact of the current (2000) extent of salinity". Please visit the source to access the original metadata of the
dataset:
https://data.gov.au/data/dataset/cost-of-salinity-to-local-infrastructure-1996-97-total-cost-all-infrastructure-buildings-road-rail-a