Mining cost study for the Australian Mineral Development Laboratories: capital and operating costs for a 4 million cubic metre per annum close connected bucket line dredge, and associated tin recovery plant
Created 17/10/2025
Updated 17/10/2025
Files and APIs
Tags
Additional Info
| Field | Value |
|---|---|
| Title | Mining cost study for the Australian Mineral Development Laboratories: capital and operating costs for a 4 million cubic metre per annum close connected bucket line dredge, and associated tin recovery plant |
| Language | eng |
| Licence | Not Specified |
| Landing Page | https://data.gov.au/data/en/dataset/0d69e5f2-68fc-47cd-b0d8-d0c39c3f8cd9 |
| Contact Point | |
| Reference Period | 20/04/2018 |
| Geospatial Coverage | Australia |
| Data Portal | Geoscience Australia |
Data Source
This dataset was originally found on
Geoscience Australia
"Mining cost study for the Australian Mineral Development Laboratories: capital and operating costs for a 4 million cubic metre per annum close connected bucket line dredge, and associated tin recovery plant". Please visit the source to access the original metadata of the
dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/mining-cost-study-for-the-australian-mineral-development-laboratories-capital-and-operating-cos