Mining cost study for the Australian Mineral Development Laboratories: capital and operating costs for a 4 million cubic metre per annum close connected bucket line dredge, and associated tin recovery plant

Created 17/10/2025

Updated 17/10/2025

Legacy product - no abstract available

Files and APIs

Tags

Additional Info

Field Value
Title Mining cost study for the Australian Mineral Development Laboratories: capital and operating costs for a 4 million cubic metre per annum close connected bucket line dredge, and associated tin recovery plant
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/en/dataset/0d69e5f2-68fc-47cd-b0d8-d0c39c3f8cd9
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage Australia
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Mining cost study for the Australian Mineral Development Laboratories: capital and operating costs for a 4 million cubic metre per annum close connected bucket line dredge, and associated tin recovery plant". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/mining-cost-study-for-the-australian-mineral-development-laboratories-capital-and-operating-cos