Summary of results. Joint GSQ_GA Geochronology Project, Peralkaline Magmatic Systems and Northeast Queensland Deposits projects, 2023_2024
Created 17/10/2025
Updated 17/10/2025
Files and APIs
Tags
Additional Info
| Field | Value | 
|---|---|
| Title | Summary of results. Joint GSQ_GA Geochronology Project, Peralkaline Magmatic Systems and Northeast Queensland Deposits projects, 2023_2024 | 
| Language | eng | 
| Licence | Not Specified | 
| Landing Page | https://data.gov.au/data/dataset/31a24a52-6e86-4f2e-9990-673322ce2335 | 
| Contact Point | |
| Reference Period | 31/10/2024 | 
| Geospatial Coverage | Map data © OpenStreetMap contributors {
  "coordinates": [
    [
      [
        154.0,
        -27.0
      ],
      [
        145.0,
        -27.0
      ],
      [
        145.0,
        -16.0
      ],
      [
        154.0,
        -16.0
      ],
      [
        154.0,
        -27.0
      ]
    ]
  ],
  "type": "Polygon"
} | 
| Data Portal | Geoscience Australia | 
Data Source
      This dataset was originally found on
      Geoscience Australia
      "Summary of results. Joint GSQ_GA Geochronology Project, Peralkaline Magmatic Systems and Northeast Queensland Deposits projects, 2023_2024". Please visit the source to access the original metadata of the
      dataset:
      
        https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/summary-of-results-joint-gsq_ga-geochronology-project-peralkaline-magmatic-systems-and-nor-2024
      
    
 
        