Leeton Shire Floodplain Risk Management Study and Plan - Final Report

Created 01/03/2026

Updated 01/03/2026

The Leeton Shire Floodplain Risk Management Study (FRMS) has been undertaken subsequent to the Leeton Shire Flood Study (Engeny, 2015). A key objective of the Leeton Shire FRMS was to develop a detailed understanding of the flood risks and develop a Floodplain Risk Management Plan (FRMP or Plan) that outlines the proposed management measures to address existing, future and continuing/residual risk. The Study Area for this project primarily focused on the two (2) major urban centres of Leeton and Yanco in the Leeton Shire LGA.

Files and APIs

Tags

Additional Info

Field Value
Title Leeton Shire Floodplain Risk Management Study and Plan - Final Report
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/28650332-dc6a-4dc1-b3e3-634275d3caed
Remote Last Updated 18/02/2026
Contact Point
Leeton Shire Council
council@leeton.nsw.gov.au
Reference Period 01/01/2018 - 07/06/2019
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Leeton Shire Floodplain Risk Management Study and Plan - Final Report". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-leeton-shire-floodplain-risk-management-study-and-plan