Proposed Alstonville Bypass : environmental impact statement : working paper no. 9 : geotechnical assessment

Created 25/06/2025

Updated 25/06/2025

Construction and operation of a high standard single carriageway road generally between the intersections with the Bruxner Highway at Perrys Hill and Sneaths Road which bypasses the village of Alstonville/Wollongbar. The proposal includes at grade intersections at each junction with the Bruxner Highway, regrading of Wardell Road and the diversion of Ellis Road. Service roads are to be provided to maintain access to local properties. The proposal includes the definition of a corridor of sufficient width to accommodate a dual carriageway, and environmental mitigation measures. This report details the results of geotechnical investigation of the preferred route of the Bruxner Highway (State Highway No. 16) Alstonville Bypass, Alstonville.

Files and APIs

Tags

Additional Info

Field Value
Title Proposed Alstonville Bypass : environmental impact statement : working paper no. 9 : geotechnical assessment
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/d61a2fd1-f852-4ab5-a306-1880dce80b72
Remote Last Updated 09/09/2021
Contact Point
Reference Period 09/09/2021
Geospatial Coverage New South Wales
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Proposed Alstonville Bypass : environmental impact statement : working paper no. 9 : geotechnical assessment". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-3-16883-proposed-alstonville-bypass-environmental-impact-statement-working-paper-no-9-geo