Murray Basin Hydrogeological Project : progress report 6 for half year ending 30th September, 1981

Created 16/10/2025

Updated 16/10/2025

The Steering Committee met on 3rd June in Canberra, and one of the matters agreed upon was that a field inspection of parts of the Basin should be held for geologists and hydrogeologists working on the Project, mainly to discuss stratigraphic correlation problems and, as well, hydrogeological aspects. Detailed planning for the field inspection, scheduled to begin early in October, and preceded by a one-day seminar, was completed. Work on a preliminary groundwater model of the whole Basin at the Geological Survey of Victoria has resulted in the development of a model to the operational stage. At BMR the compilation of available geological and geophysical data has continued steadily, and by the end of the year it is expected that all bores from which stratigraphic information has been obtained will have been plotted, and preparation of structure contour maps can begin.

Files and APIs

Tags

Additional Info

Field Value
Title Murray Basin Hydrogeological Project : progress report 6 for half year ending 30th September, 1981
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/a208968a-80b3-4344-b00f-8f2d5caec09d
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage Australia
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Murray Basin Hydrogeological Project : progress report 6 for half year ending 30th September, 1981". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/murray-basin-hydrogeological-project-progress-report-6-for-half-year-ending-30th-september-1981