Hydrogeological and geophysical investigations on Norfolk Island, 1981

Created 16/10/2025

Updated 16/10/2025

In June 1980 the Department of Housing and Construction (DHC) completed a report on the proposed water supply iand swerage project for Norfolk Island (Goldfinch & Cross, 1980). This report requested that the Bureau of Mineral Resources (BMR) implement the following recommendations:

Undertake hydrogeological investigations on Norfolk Island as recommended in a Groundwater reprot on Norfolk Island (Abell, 1976). Undertake investigations, drilling and testing as appropriate to provide observation and production bores in either or both of the Broken Bridge/Mission Creek valleys. A sufficient number of bores are to be drilled so that a production rate of not less than 10.4 L/sec is achieved with at least one bore in exess of minimum requirements to provide standby capacity. Each production bore is to be cased and fitted with screens.

The main objective of the survey was a hydrogeological/geophysical investigation in the Broken Bridge - Mission Creek valleys leading to the selection of drill sites and recommendations on drilling to ascertain whether a groundwater supply at deeper levels on the island can be developed free of pollution from human or other agencies.

Files and APIs

Tags

Additional Info

Field Value
Title Hydrogeological and geophysical investigations on Norfolk Island, 1981
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/c3dbfb8d-3798-434c-8bf9-529f27581725
Contact Point
Geoscience Australia Data
clientservices@ga.gov.au
Reference Period 20/04/2018
Geospatial Coverage Australia
Data Portal Geoscience Australia

Data Source

This dataset was originally found on Geoscience Australia "Hydrogeological and geophysical investigations on Norfolk Island, 1981". Please visit the source to access the original metadata of the dataset:
https://ecat.ga.gov.au/geonetwork/srv/eng/csw/dataset/hydrogeological-and-geophysical-investigations-on-norfolk-island-1981