ERS-1 phase G Satellite Altimeter Data - CMR Processed - 1995-1996

Created 25/06/2025

Updated 25/06/2025

Satellite altimeter data from the radar altimeter on board the European ERS-1 satellite, phase G, comprising Global (81S -> 81N) sea surface height anomalies along ground tracks which are repeated every 35 days. The dataset (which is combined online with phase C of the same mission) is approximately 190 Mb and the period covered is March 1995 to June 1996. The data was provided by Aviso/CNES in France and has been reformatted at CSIRO Marine Research in Hobart to a uniform grid spacing and format. Available on-line on the CSIRO Marine Research network; also available to outside users on request.

Files and APIs

Additional Info

Field Value
Title ERS-1 phase G Satellite Altimeter Data - CMR Processed - 1995-1996
Language eng
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/c63567bf-e3d6-44f8-a196-90faad58e907
Contact Point
CSIRO Marlin Data Catalogue
data-requests-hf@csiro.au
Reference Period 24/03/1995 - 02/06/1996
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    [
      [
        -180.0,
        -81.0
      ],
      [
        180.0,
        -81.0
      ],
      [
        180.0,
        81.0
      ],
      [
        -180.0,
        81.0
      ],
      [
        -180.0,
        -81.0
      ]
    ]
  ],
  "type": "Polygon"
}
Data Portal CSIRO Marlin

Data Source

This dataset was originally found on CSIRO Marlin "ERS-1 phase G Satellite Altimeter Data - CMR Processed - 1995-1996". Please visit the source to access the original metadata of the dataset:
https://marlin.csiro.au/geonetwork/srv/eng/csw/dataset/ers-1-phase-g-satellite-altimeter-data-cmr-processed-1995-19961