-
Hydrologic indicator results for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The MDBA analysed hydrologic condition in the Basin across a range of metrics or 'flow components'. The immediate results of this analysis and well as the results from... -
Modelled hydrologic data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The hydrologic condition analysis for the 2020 Basin Plan Evaluation drew on data of estimated flows derived from hydrologic modelling done during the development of... -
Observed hydrologic data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The hydrologic analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on watercourse discharge observations made at gauging stations across the... -
Catchment inflow data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview Estimates of inflows into catchments was a core component of the hydrologic condition analysis done for the 2020 Basin Plan Evaluation. These catchment inflows were... -
Waterbird data for the Basin Plan Evaluation 2020
Murray-Darling Basin Authority
Overview The aerial waterbird survey (AWS) analysis that underpinned the Basin Plan Evaluation 2020 drew predominately on annual aerial survey data across 38 key wetlands across... -
Murray-Darling Basin Tree Stand Condition Assessment Tool
Murray-Darling Basin Authority
The stand condition of river red gums, black box and coolibah have been identified as objectives to measure the progress towards achieving outcomes of the Murray-Darling Basin... -
Australian Government Water Recovery Programs in the Murray-Darling Basin - 2010-2019
Department of Agriculture, Fisheries and Forestry
To return the Murray–Darling river system to health, the Murray–Darling Basin Plan requires recovery of surface water and groundwater for the environment. The government has...
1 - 7 of 7 results