Wellington - Floodplain Risk Management Study report

Created 24/06/2025

Updated 24/06/2025

The Wellington FRMS 2013 covers the following topics: The Summary and Recommendations preceding this report summarises this report and presents the recommended flood mitigation options for Wellington. Chapter 2 The Wellington Floodplain, describes the existing situation in relation to the physical setting and flood producing mechanism, flood extents and resulting flood damages, transport linkages, planning instruments and the existing flood emergency system. It draws upon previous investigations including the Wellington Flood Study carried out by the Department of Land and Water Conservation (DLWC) in 1995, as well as data supplied by Council and a revised estimate of extreme flood conditions at Wellington. Chapter 3 Flood Planning Levels and Flood Risk Precincts, details the issues which were evaluated in preparing recommendations for the Flood Planning Levels and Flood Risk Precincts. Chapter 4 Status of the 1996 Plan Implementation, contains an assessment of the progress of the implementation of the 1996 FRMP. Chapter 5 Potential Floodplain Management Measures, presents an appraisal of potential measures which may be incorporated in the FRMP. Chapter 6 Selection of Floodplain Management Measures, outlines a range of considerations to be taken into account in the selection of the mix of measures recommended for inclusion in the FRMP. Chapter 7 The updated Flood Risk Management Plan 2013, summarises the recommended elements for inclusion in the FRMP and provides information on funding and implementation. Several technical appendices have been prepared which provide background information: Appendix A A description of the flood conditions in the Macquarie and Bell Rivers, including review of the 1995 Flood Study and the results of additional hydraulic modelling undertaken for the 2013 study Appendix B A review of the effects of Burrendong Dam in attenuating floods Appendix C An assessment of urban flood damages in Wellington Appendix D An appraisal of existing emergency management procedures Appendix E Recommended amendments to Wellington LEP 2012 and DCP 2013 __Appendix F__Report on the Aspley Drainage Study Appendix G Background to the selection of floodplain management measures Appendix H Candidates for Voluntary Purchase and House Raising Schemes

Files and APIs

Tags

Additional Info

Field Value
Title Wellington - Floodplain Risk Management Study report
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/7248b9af-8fe3-471a-8577-1f9815ea81c8
Remote Last Updated 30/04/2025
Contact Point
Dubbo Regional Council
council@dubbo.nsw.gov.au
Reference Period 30/04/2025 - 01/11/2013
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Wellington - Floodplain Risk Management Study report". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-wellington-floodplain-risk-management-study-repor