Green Point Creek, Pearl Beach Floodplain Management Study

Created 24/06/2025

Updated 24/06/2025

The Green Point Creek system has been divided into component areas for application of a floodplain management plan. The component areas, illustrated on Figure 13, cover:

Tourmaline Avenue Floodway Area; Tourmaline Avenue - Flood-Liable Developed Area; Crystal Avenue Floodway; Tourmaline Avenue Culvert Area - currently flood-liable; and Diamond - Tourmaline Avenue - Flood-Liable Developed Area.

The specific points applied in each of the above areas involve:

land use controls; building development controls; limited channel erosion protection under government funding; the bulk of channel erosion protection by land owner finance; and structural works, as outlined above with Tourmaline Avenue culvert replacement, floodplain restoration and acquisition of one house.

Files and APIs

Tags

Additional Info

Field Value
Title Green Point Creek, Pearl Beach Floodplain Management Study
Language English
Licence Not Specified
Landing Page https://data.gov.au/data/dataset/53bacc1a-79a5-4633-9276-37e8443c6c2f
Remote Last Updated 25/03/2024
Contact Point
Central Coast Council
ask@centralcoast.nsw.gov.au
Reference Period 03/02/2022 - 01/11/1992
Geospatial Coverage
Map data © OpenStreetMap contributors
{
  "coordinates": [
    147.0179,
    -32.1618
  ],
  "type": "Point"
}
Data Portal DataNSW

Data Source

This dataset was originally found on DataNSW "Green Point Creek, Pearl Beach Floodplain Management Study". Please visit the source to access the original metadata of the dataset:
https://data.nsw.gov.au/data/dataset/nsw-fdp-green-point-creek-pearl-beach-floodplain-management-study-final