-
Cockrone Lagoon Floodplain Management Study
Cockrone Lagoon study outlines existing flood behaviour, environmental and planning considerations, flood damages assessment, flood plain management options and their impacts,... -
Cockrone Lagoon Flood Study
Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the... -
Cockrone Lagoon Floodplain Management Plan
The Floodplain Management Plan divides the Cockrone Lagoon area into six precincts:- Cockrone Lagoon - Beach Berm High Hazard Floodway/Investigation
- Cockrone...
-
Tuggerah Lakes Southern Catchments Flood Study - DTM
Data contains DTM for all catchments -
Tumbi Umbi Creek Floodplain Risk Management Review and Plan - Report
Report complete (incl. figures and appendices) -
Green Point Creek, Pearl Beach Floodplain Management Study
The Green Point Creek system has been divided into component areas for application of a floodplain management plan. The component areas, illustrated on Figure 13, cover:- ...
-
Tuggerah Lakes Southern Catchments Flood Study - GIS
Data contains figures, shape files and grids -
Northern Lakes Flood Study - Consultation
Contains Brochure, letter and community responses -
Avoca Lagoon Floodplain Management Study
Avoca Lagoon is the largest of the four coastal lagoons within Gosford. The lagoon has a cruciform shape with a surface area of 97.5 hectares and average depth of 1.3 metres.... -
Report on Gosford Lagoon Openings June-July 1994
Lagoon Opening data:- Wamberal Lagoon and Avoca lake openings
- Automatic recorder levels
- Comparison of Wamberal lagoon openings
- Comparison of...