{"help": "https://data.gov.au/data/en/api/3/action/help_show?name=package_show", "success": true, "result": {"archived": false, "author": "Orange City Council", "author_email": null, "contact_point": "council@orange.nsw.gov.au", "creator_user_id": "c2fbbe4a-4ba0-4945-808b-67454605a4cf", "duplicate_score": 2, "geospatial_topic": [], "id": "f4d94d20-e3f1-411a-a2cb-e9719eba5b64", "isopen": false, "license_id": "lsba", "license_title": "lsba", "maintainer": null, "maintainer_email": null, "metadata_created": "2025-06-24T19:36:13.423729", "metadata_modified": "2025-12-19T19:27:50.061612", "name": "nsw-fdp-orange-ultimate-flood-modification-scheme-phase-a", "notes": "Phase A comprised an update of the existing DRAINS and TUFLOW flood modelling (developed as part of \nthe Blackmans Swamp Creek and Ploughmans Creek Floodplain Risk Management Study &amp; Plan) for the 1% \nAEP event from Australian Rainfall &amp; Runoff (ARR) 1987 to ARR 2019 methodology.", "num_resources": 1, "num_tags": 0, "organization": {"id": "dacc9557-9ae4-4d45-a2ad-5fca4284a644", "name": "orange-city-council-datansw", "title": "Orange City Council", "type": "organization", "description": "The City of Orange is a local government area in the central west region of New South Wales. Based in Orange, the area is located adjacent to the Mitchell Highway and the Main Western railway line, and is home to over 41,800 people and is 285 km\u00b2 in area.\r\n\r\nhttp://www.orange.nsw.gov.au/site/index.cfm", "image_url": "", "created": "2025-06-24T05:05:26.282416", "is_organization": true, "approval_status": "approved", "state": "active"}, "original_harvest_source": {"site_url": "https://data.nsw.gov.au/data/", "href": "https://data.nsw.gov.au/data/dataset/nsw-fdp-orange-ultimate-flood-modification-scheme-phase-a", "title": "DataNSW"}, "original_name": "nsw-fdp-orange-ultimate-flood-modification-scheme-phase-a", "owner_org": "dacc9557-9ae4-4d45-a2ad-5fca4284a644", "private": false, "promotion_level": "0", "remote_last_updated": "2025-12-17 04:53:27.969023", "spatial": "{\"type\": \"Point\",\"coordinates\": [147.0179,-32.1618]}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_from": "2022-11-14 00:00:00", "temporal_coverage_to": "2023-08-11 00:00:00", "title": "Orange Ultimate Flood Modification Scheme Phase A", "type": "dataset", "unpublished": false, "url": null, "version": null, "extras": [{"key": "harvest_object_id", "value": "68e31e75-3df8-4bfb-8809-e440688e427d"}, {"key": "harvest_source_id", "value": "9ebac586-8e51-4904-9f6c-d9b79726659a"}, {"key": "harvest_source_title", "value": "DataNSW"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2025-12-17T04:53:27.985869", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "d84deb44-0ba6-4aed-adad-d32601a6c979", "last_modified": null, "metadata_modified": "2025-12-19T19:27:44.518170", "mimetype": null, "mimetype_inner": null, "name": "The Orange Ultimate Flood Modification Scheme: Feasibility & Design Project \u2013 Phase A: ARR19 Update Memorandum", "package_id": "f4d94d20-e3f1-411a-a2cb-e9719eba5b64", "position": 0, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/91927b8c-6bbc-42f7-8875-54435ac503a8/resource/f575274b-4f24-41ec-836e-f4c7fe218062", "url_type": null, "zip_extract": false}], "tags": [], "groups": [], "relationships_as_subject": [], "relationships_as_object": []}}