{"help": "https://data.gov.au/data/en/api/3/action/help_show?name=package_show", "success": true, "result": {"archived": false, "author": "Central Coast Council", "author_email": null, "contact_point": "ask@centralcoast.nsw.gov.au", "creator_user_id": "c2fbbe4a-4ba0-4945-808b-67454605a4cf", "duplicate_score": 2, "geospatial_topic": [], "id": "16669f3d-dbd8-49f1-9a2b-fb699d003096", "isopen": false, "license_id": "cc-by", "license_title": "Creative Commons Attribution 3.0 Australia", "license_url": "http://creativecommons.org/licenses/by/3.0/au/", "maintainer": null, "maintainer_email": null, "metadata_created": "2025-06-23T19:52:14.407764", "metadata_modified": "2025-12-17T17:59:31.255841", "name": "nsw-fdp-ourimbah-creek-floodplain-risk-management-study-plan-report", "notes": "The Ourimbah Creek Floodplain Risk Management Plan has been prepared for the Central Coast Council in accordance with the NSW Government\u2019s Floodplain Development Manual 2005 (Reference 1) and:\n\uf0b7 Is based on a comprehensive and detailed evaluation of factors that affect and are\naffected by the use of flood prone land;\n\uf0b7 Represents the considered opinion of the local community on how to best manage its flood risk and its flood prone land; and\n\uf0b7 Provides a long-term path for the future development of the community.\n\nThe Ourimbah Creek catchment is located on the Central Coast of NSW, approximately 90km north of Sydney. Covering a total area of 160 km2, the majority of the catchment is contained in the Wyong Shire Local Government Area (LGA), with 8 km\u00b2 of the catchment contained in the Gosford City LGA to the south. In 2016 the two councils were combined into the Central Coast Council.\n\nFlooding has been recorded periodically since the 1930\u2019s but there are many more recorded instances of flooding in Tuggerah Lakes. It is possible that the incidence of flooding has historically been under reported along Ourimbah Creek and its tributaries. In recent times there have been two significant events, in February 1990 and June 2007. In both these events there was extensive flooding in the Newcastle, Lake Macquarie and Wyong/Gosford regions.\n\nFlooding causes significant hardship, including both tangible and intangible damages, to the community and for this reason the Central Coast Council has undertaken a program of studies to address the management of the flood problem in accordance with the NSW Government\u2019s Floodplain Development Manual 2005 (Reference 1).", "num_resources": 1, "num_tags": 3, "organization": {"id": "c3197e8b-da78-4b75-b9e9-ab8cb49e6d66", "name": "central-coast-council-datansw", "title": "Central Coast Council", "type": "organization", "description": "Central Coast Council is responsible for the sixth largest urban area in Australia. Our Council area is 1681 square kilometres, which makes us far bigger geographically than Canberra.\r\n\r\nThe most recent projected population of the Central Coast by 2036 is 415,050. That\u2019s a 23% increase in population, of approximately 80,000 people. Planning for growth and maintaining the lifestyle that our community enjoys is important for Council.\r\n", "image_url": "", "created": "2025-06-24T03:31:12.861239", "is_organization": true, "approval_status": "approved", "state": "active"}, "original_harvest_source": {"site_url": "https://data.nsw.gov.au/data/", "href": "https://data.nsw.gov.au/data/dataset/nsw-fdp-ourimbah-creek-floodplain-risk-management-study-plan-report", "title": "DataNSW"}, "original_name": "nsw-fdp-ourimbah-creek-floodplain-risk-management-study-plan-report", "owner_org": "c3197e8b-da78-4b75-b9e9-ab8cb49e6d66", "private": false, "promotion_level": "0", "remote_last_updated": "2025-12-17 04:23:38.225976", "spatial": "{\"type\": \"Point\",\"coordinates\": [147.0179,-32.1618]}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_from": "2022-02-02 23:04:44.221479", "temporal_coverage_to": "2019-07-25 00:00:00", "title": "Ourimbah Creek Floodplain Risk Management Study & Plan Report", "type": "dataset", "unpublished": false, "url": "", "version": null, "extras": [{"key": "harvest_object_id", "value": "b4d9792c-7207-4be2-82b3-12495d08e76c"}, {"key": "harvest_source_id", "value": "9ebac586-8e51-4904-9f6c-d9b79726659a"}, {"key": "harvest_source_title", "value": "DataNSW"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2025-12-17T04:23:38.269710", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "fdaa1604-5af8-4557-861e-80fdaf7103df", "last_modified": null, "metadata_modified": "2025-12-17T17:59:26.007215", "mimetype": null, "mimetype_inner": null, "name": "Ourimbah Creek Floodplain Risk Management Study & Plan Final report", "package_id": "16669f3d-dbd8-49f1-9a2b-fb699d003096", "position": 0, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/1741289b-eed8-49f5-ae1d-c0bca56a63f7/resource/92ddff15-603d-4eca-b73e-1dc9adda7ffe", "url_type": null, "zip_extract": false}], "tags": [{"display_name": "Central Coast", "id": "90d26555-72f4-4a01-987a-4664511829fd", "name": "Central Coast", "state": "active", "vocabulary_id": null}, {"display_name": "Floodplain Management", "id": "e1915595-7231-4425-8ed5-e398499eab50", "name": "Floodplain Management", "state": "active", "vocabulary_id": null}, {"display_name": "Ourimbah Creek", "id": "b4219821-146c-4e78-a6bd-9aab238a3db4", "name": "Ourimbah Creek", "state": "active", "vocabulary_id": null}], "groups": [], "relationships_as_subject": [], "relationships_as_object": []}}