{"help": "https://data.gov.au/data/en/api/3/action/help_show?name=package_show", "success": true, "result": {"archived": false, "author": "Liverpool City Council", "author_email": null, "contact_point": "lcc@liverpool.nsw.gov.au", "creator_user_id": "c2fbbe4a-4ba0-4945-808b-67454605a4cf", "duplicate_score": 2, "geospatial_topic": [], "id": "04ec9683-d93e-4c8b-82ef-8b9a8eaa89b0", "isopen": false, "license_id": "cc-by", "license_title": "Creative Commons Attribution 3.0 Australia", "license_url": "http://creativecommons.org/licenses/by/3.0/au/", "maintainer": null, "maintainer_email": null, "metadata_created": "2026-03-01T07:30:59.586395", "metadata_modified": "2026-03-01T07:31:06.974848", "name": "nsw-fdp-liverpool-overland-flow-path-study-stage-2-report", "notes": "This report documents the Study\u2019s objectives, results and recommendations.\n<ul>\n<li>Section 1 introduces the study.</li>\n<li>Section 2 provides some background information and a summary of available data.</li>\n<li>Section 3 outlines the community consultation undertaken.</li>\n<li>Section 4 outlines the general modelling approach and key assumptions.</li>\n<li>Section 5 details the model development and results for Area 1.</li>\n<li>Section 6 details the model development and results for Area 2.</li>\n<li>Section 7 details the model development and results for Area 3.</li>\n<li>Section 8 presents sensitivity tests of key parameters/assumptions for the developed models.</li>\n<li>Section 9 provides a summary of the flood damages assessment.</li>\n<li>Section 10 identifies key hot-spot areas from the modelling results and an initial assessment of\npotential flood mitigation options.</li>\n</ul>\n\nThe key output from the overland flow study comprises a series of flood maps for each study area\nwhich are included in Appendix A. This mapping includes flood depth, velocity and hazard for the\nrange of design return period events considered.", "num_resources": 1, "num_tags": 3, "organization": {"id": "ef419c71-1dd7-4ea1-a071-16235a7c9daf", "name": "liverpool-city-council-datansw", "title": "Liverpool City Council", "type": "organization", "description": "__Liverpool City Council__ governs 42 suburbs in the south west of Sydney and has an expanding population on 180,143. \r\n\r\nhttp://www.liverpool.nsw.gov.au/\r\n\r\nThe Liverpool area is located on a number of floodplains, which means that our area is subject to flooding.\r\n\r\nFlooding can cause significant damage, both tangible and intangible, so to protect our future livelihood, Council has adopted a number of Floodplain Risk Management Plans:\r\n\r\n* Anzac Creek Floodplain Risk Management Study and Plan\r\n* South Creek Floodplain\r\n* Cabramatta Creek Risk Management Study and Plan\r\n* Georges River Floodplain Risk management Study and Plan\r\n* Austral Floodplain Risk Management Study and Plan\r\n* Liverpool CBD Floodplain Risk Management Study and Plan", "image_url": "", "created": "2025-06-24T03:49:36.739092", "is_organization": true, "approval_status": "approved", "state": "active"}, "original_harvest_source": {"site_url": "https://data.nsw.gov.au/data/", "href": "https://data.nsw.gov.au/data/dataset/nsw-fdp-liverpool-overland-flow-path-study-stage-2-report", "title": "DataNSW"}, "original_name": "nsw-fdp-liverpool-overland-flow-path-study-stage-2-report", "owner_org": "ef419c71-1dd7-4ea1-a071-16235a7c9daf", "private": false, "promotion_level": "0", "remote_last_updated": "2026-01-19 05:31:01.931639", "spatial": "{\"type\": \"Point\",\"coordinates\": [147.0179,-32.1618]}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_from": "2025-12-17 05:38:34.713223", "temporal_coverage_to": "2008-08-01 00:00:00", "title": "Liverpool Overland Flow Path Study Stage 2 - Final Report", "type": "dataset", "unpublished": false, "url": null, "version": null, "extras": [{"key": "harvest_object_id", "value": "81339b05-1ab3-4a26-8c8e-e9f61aaa9671"}, {"key": "harvest_source_id", "value": "9ebac586-8e51-4904-9f6c-d9b79726659a"}, {"key": "harvest_source_title", "value": "DataNSW"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2026-01-19T05:31:02.015451", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "651cc61f-0add-414d-b928-1cef99f20ea5", "last_modified": null, "metadata_modified": "2026-03-01T07:30:59.582656", "mimetype": null, "mimetype_inner": null, "name": "Liverpool - Overland Flow Path Study Stage 2", "package_id": "04ec9683-d93e-4c8b-82ef-8b9a8eaa89b0", "position": 0, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/ec1ca086-696b-45dc-b86a-2881abe43ed9/resource/6ba8052a-4f28-4f1a-9b25-5957de868e39", "url_type": null, "zip_extract": false}], "tags": [{"display_name": "Liverpool", "id": "fcdd41c0-799c-448e-9c14-ae774e87c60c", "name": "Liverpool", "state": "active", "vocabulary_id": null}, {"display_name": "hydraulic model", "id": "5ea1bf91-c991-4e1b-808e-2528b9741aa5", "name": "hydraulic model", "state": "active", "vocabulary_id": null}, {"display_name": "hydrologic model", "id": "306ddc3f-3866-4055-8fd7-0e4cd32a2a1a", "name": "hydrologic model", "state": "active", "vocabulary_id": null}], "groups": [], "relationships_as_subject": [], "relationships_as_object": []}}