- 
    
    Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP):...The AusLAMP-Victoria magnetotelluric survey was a collaborative project between the Geological Survey of Victoria and Geoscience Australia. Long period magnetotelluric data were...
- 
    
    Resistivity model derived from magnetotellurics: AusLAMP-TISA projectThe Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP) aims to collect long period magnetotelluric data on a half degree (~55 km) grid across the Australian...
- 
    
    Geoscience Australia Magnetotelluric Data Location Package: Government...Geoscience Australia (GA), in partnership with State (SA, NSW, VIC, QLD, WA and TAS) and Northern Territory Geological Surveys, has applied the magnetotelluric (MT) technique to...
- 
    
    Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP): New...The Australian Lithospheric Architecture Magnetotelluric Project (AusLAMP): New South Wales (NSW) magnetotelluric survey is a collaborative project between the Geological Survey...
            
            
              
                1 - 4 of 4 results