-
Survey report 1997/98 summer season Voyage 4 to 5 Australian Antarctic...
Taken from sections of the report: This report has been prepared as a supplement to the 1997/98 Survey Report by John Hyslop and contains solely comments and recommendations as... -
Survey report 2003/04 summer season Australian Antarctic Division Author -...
Taken from sections of the report: Introduction This report describes aspects of the fieldwork completed for the Australian Antarctic Division (AAD) mapping program during the... -
Survey report 1998/99 summer season Voyage 4 Australian Antarctic Division...
Taken from sections of the report: Introduction This report details the survey work carried out on Voyage 4 during November and December 1998 by LANDINFO on behalf of the... -
Survey report 1997/98 summer season Voyage 2 to 5
Introduction The purpose of the 97/98 Antarctic survey season was to provide survey control and vertical and oblique aerial photography around Mawson, Davis, Beaver Lake, and... -
Survey report 1996/97 Voyage 3 Australian Antarctic Division Author -...
Taken from sections of the report: Introduction This report details the survey work carried out on Macquarie Island during November and December of 1996 by the Australian... -
Survey report 1996/97 summer season Voyage 4 to 5 Australian Antarctic...
Taken from sections of the report: Introduction This report details the survey work carried out in Antarctica and Heard Island from December of 1996 to March of 1997 by AUSLIG... -
Survey report 1998/99 summer season Voyage 5.1 Australian Antarctic Division...
Taken from sections of the report: The aim of the survey and mapping program on V5.1 was to carry out various surveying tasks at Mawson and Casey as listed later in this report.... -
Habitat Sampling Initiative
Department of Biodiversity, Conservation and Attractions
An overview of benthic habitat surveys in Western Australia, combining surveys from multiple State Government agencies, research institutions and Universities. Disclaimer: The... -
Cost of Salinity to Local Infrastructure 1996-97 – Summary of component...
Australian Bureau of Agricultural and Resource Economics and Sciences
This dataset contains 14 national surfaces, represented by 1km grids, relating to the cost of salinity damage to local infrastructrure. The infrastructure cost impacts are... -
Downstream Cost Calculator Model and Data for 1996/97 or 2001 prices
This spreadsheet model is used to determine the downstream costs of salinity, turbidity, erosion and sedimentation to urban and industrial water users. It was produced by the...
1 - 10 of 10 results