{"help": "https://data.gov.au/data/api/3/action/help_show?name=package_show", "success": true, "result": {"archived": false, "author": "Northern Beaches Council", "author_email": null, "contact_point": "manly@northernbeaches.nsw.gov.au", "creator_user_id": "c2fbbe4a-4ba0-4945-808b-67454605a4cf", "duplicate_score": 2, "geospatial_topic": [], "id": "2c510cf9-36e5-4ade-8f74-d3e8e863a3c2", "isopen": false, "license_id": "lsba", "license_title": "lsba", "maintainer": null, "maintainer_email": null, "metadata_created": "2025-06-23T22:20:08.771004", "metadata_modified": "2025-12-17T23:43:01.861276", "name": "nsw-fdp-ingleside-eleanora-warriewood-offs-climate-change", "notes": "The effect of climate change on the study area was investigated for the 1% AEP design and PMF events. The following scenarios were modelled:\n- 1% AEP design storm event plus 0.9 m sea level rise;\n-  1% AEP design storm event with a 10% increase in rainfall plus 0.9 m sea level rise;\n-  1% AEP design storm event with a 30% increase in rainfall plus 0.9 m sea level rise;\n-  PMF storm event plus 0.9 m sea level rise;\n- PMF storm event with a 10% increase in rainfall plus 0.9 m sea level rise;\n- PMF storm event with a 30% increase in rainfall plus 0.9 m sea level rise.\nDepth and velocity mapping for both the 1% AEP and PMF events with a 30% increase in rainfall plus 0.9 m sea level rise are included as Figure D1 to Figure D4.", "num_resources": 1, "num_tags": 2, "organization": {"id": "944317c5-4cd7-4f5d-afdf-3f24da0c35f7", "name": "northern-beaches-council-datansw", "title": "Northern Beaches Council", "type": "organization", "description": "The Northern Beaches Council is a recent LGA on Sydney's northern beaches formed from the merger of Manly, Pittwater and Warringah councils. \r\n\r\nhttp://www.northernbeaches.nsw.gov.au/\r\n\r\nFlood Studies, Plans and Maps available:\r\nhttp://www.pittwater.nsw.gov.au/property/natural_hazards/flooding/where_does_it_flood/flood_studies_and_plans\r\n\r\nCareel Creek\r\nAvalon to Palm Beach Flood Risk Management Study and Plan - current project.\r\nCareel Creek Catchment Flood Study - July 2013\r\nCareel Creek Floodplain Risk Management Plan November 2002 \r\nCareel Creek Floodplain Management Study Sept 2000 \r\nCareel Creek Drainage Catchment Flood Study June 1999 - superseded\r\n\r\nGreat Mackerel Beach\r\nGreat Mackerel Beach Floodplain Risk Management Study and Plan - November 2010\r\nGreat Mackerel Beach Flood Study September 2005\r\n\r\nMona Vale/Bayview\r\nMcCarrs Creek, Mona Vale and Bayview Flood Study - current project\r\nMona Vale - Bayview Flood Study May 2002\r\n\r\nNarrabeen Lagoon\r\nNarrabeen Lagoon Flood Study - September 2013\r\nNarrabeen Lagoon Floodplain Risk Management Plan Vol 1 Pittwater December 2002\r\nNarrabeen Lagoon Floodplain Management Study 1992\r\n\r\nNareen Creek (subcatchment of Narrabeen Lagoon)\r\nNareen Creek Flood Study September 2005 - superseded\r\n\r\nWarriewood Valley (subcatchment of Narrabeen Lagoon)\r\nWarriewood Valley Flood Study April 2005 - superseded\r\nWarriewood Valley Flood Study Addendum 1 July 2005 - superseded\r\nWarriewood Valley Urban Land Release Water Management  Specification - February 2001\r\n\r\nNewport\r\nNewport Beach Floodplain Risk Management Study & Plan February 2004\r\nNewport Beach Flood Study March 2002\r\n\r\nOther Areas\r\nPittwater Overland Flow Mapping and Flood Study - October 2013\r\nMcCarrs Creek, Mona Vale and Bayview Flood Study - current project\r\nAvalon to Palm Beach Flood Risk Management Study and Plan - current project\r\n", "image_url": "", "created": "2025-06-24T03:44:34.804318", "is_organization": true, "approval_status": "approved", "state": "active"}, "original_harvest_source": {"site_url": "https://data.nsw.gov.au/data/", "href": "https://data.nsw.gov.au/data/dataset/nsw-fdp-ingleside-eleanora-warriewood-offs-climate-change", "title": "DataNSW"}, "original_name": "nsw-fdp-ingleside-eleanora-warriewood-offs-climate-change", "owner_org": "944317c5-4cd7-4f5d-afdf-3f24da0c35f7", "private": false, "promotion_level": "0", "remote_last_updated": "2025-12-17 05:02:35.204389", "spatial": "{\"type\": \"Point\",\"coordinates\": [147.0179,-32.1618]}", "spatial_coverage": "New South Wales (NSW81093)", "state": "active", "temporal_coverage_from": "2025-03-18 22:15:52.655232", "temporal_coverage_to": "2019-06-13 00:00:00", "title": "Ingleside, Eleanora, Warriewood OFFS Climate Change", "type": "dataset", "unpublished": false, "url": null, "version": null, "extras": [{"key": "harvest_object_id", "value": "1d613bf9-2664-4b50-9693-8bcdb2d915a7"}, {"key": "harvest_source_id", "value": "9ebac586-8e51-4904-9f6c-d9b79726659a"}, {"key": "harvest_source_title", "value": "DataNSW"}], "resources": [{"cache_last_updated": null, "cache_url": null, "created": "2025-12-17T05:02:35.244051", "datastore_active": false, "datastore_contains_all_records_of_source_file": false, "format": "HTML", "hash": "", "id": "6300c3cd-7e47-4fad-9e30-8c10e01497db", "last_modified": null, "metadata_modified": "2025-12-17T23:42:55.439394", "mimetype": null, "mimetype_inner": null, "name": "Results for climate change", "package_id": "2c510cf9-36e5-4ade-8f74-d3e8e863a3c2", "position": 0, "resource_type": null, "size": null, "state": "active", "url": "https://flooddata.ses.nsw.gov.au/dataset/edc17012-09b2-49d8-82d4-25d00ad56dd9/resource/c02de10c-b014-43fb-ad61-f18d85a219c2", "url_type": null, "zip_extract": false}], "tags": [{"display_name": "Flood study", "id": "4d3c3a39-83d3-40bb-8411-4bbe67031b5c", "name": "Flood study", "state": "active", "vocabulary_id": null}, {"display_name": "Pittwater", "id": "ebfa6eb0-5a60-4186-91b2-17a82ae30cbc", "name": "Pittwater", "state": "active", "vocabulary_id": null}], "groups": [], "relationships_as_subject": [], "relationships_as_object": []}}