Cost of Salinity to Local Infrastructure 1996-97 – Total cost the general infrastructure component (buildings etc derived from population) based on the best estimate as described in the project reports. Costs are estimates of the impact of the current (2000) extent of salinity

Description

This dataset contains 14 national surfaces, represented by 1km grids, relating to the cost of salinity damage to local infrastructrure. The infrastructure cost impacts are limited to those that occur at the location of salinity problem, downstream and other offsite impacts are not covered. All dollar values are given in 1996/97 Australian dollars. Each is described as follows:1. Total cost ($) to all infrastructure (buildings, road, rail and bridges) based on the low, “best” and high estimates of the impact of the current (2000) extent of salinity.2. Total cost ($) to all infrastructure (buildings, road, rail and bridges) based on the low, “best” and high estimates of the impact of predicted 2020 extent of salinity3. Total cost ($) the general infrastructure component (buildings etc., derived from population) as the “best” estimate of the impact of the current (2000) extent of salinity.4. Total cost ($) the general infrastructure component (buildings etc., derived from population) based on the “best” estimate of the impact of the predicted 2020 extent of salinity5. Total cost ($) the road component of infrastructure based on the “best” estimate of the impact of the current (2000) extent of salinity.6. Total cost ($) the road component of infrastructure based on the “best” estimate of the impact of the predicted 2020 extent of salinity7. Total cost ($) the rail component of infrastructure based on the “best” estimate of the impact of the current (2000) extent of salinity.8. Total cost ($) the rail component of infrastructure based on the “best” estimate of the impact of the predicted 2020 extent of salinity9. Total cost ($) the bridge component of infrastructure based on the “best” estimate of the impact of the current (2000) extent of salinity.10. Total cost ($) the bridge component of infrastructure based on the “best” estimate of the impact of the predicted 2020 extent of salinity11. Total cost ($) increase to local infrastructure based on the “best” estimate of the impact of the predicted 2020 extent of salinity

See further metadata for more detail.

Download
Date Published
1 June 2000
Date Updated
1 October 2010
Update Frequency
Not specified

Dataset Information

data.gov.au Category
Keywords / Tags
, , , ,
Licence
Constraints
Permalink
http://data.gov.au/4540

Contributing Agency Information

Agency
Department of Agriculture Fisheries and Forestry (View all datasets from Department of Agriculture Fisheries and Forestry)
Jurisdiction
Agency Program
Australian Bureau of Agricultural and Resource Economics and Sciences

Dataset Coverage

Temporal Coverage
2000
Geospatial Coverage
Australia
Granularity
Not specified

Rate this dataset

VN:F [1.9.11_1134]
Data Quality
Data Format
Data Usefulness
Rating: 0.0/5 (0 votes cast)

Leave a Reply